CoE Infrastructure Development

  • Four labs has been set up in the centre.
  • Following equipment have been received at centre as part of the CoE facility for testing and characterization of refractories materials in the various labs:
    • High Temperature furnace having temperature 1400, 1600 deg C(4 nos)
    • ​Spalling resistance furnace @1400 deg C
    • Static corrosion facilities
    • Universal testing machine having capacity 50, 500 and 2000KN (3nos)
    • Roll Crusher
    • Jaw crusher
    • Core drilling Machine
    • Diamond cutter
    • Castable vibrating Table
    • PCE/RUL
    • UV Spectroscopy
    • Flame photometer
  • This facility will intensify the capacity building and research collaboration with academic/industrial organizations
  • The facility will help in revenue generation and thereby make the CoE sustainable